The averaged bill demand and energy cost for the All-Requirements Project (ARP) in September were 18% below the budgeted cost.
FMPA hosted a field trip for more than a dozen students from Trinity Catholic High School in Ocala.
FMPA assisted FDOT with utility redesign and relocation for a bridge replacement in Fort Meade.
The Orlando Sentinel named FMPA a Top Workplace in Central Florida for the fourth consecutive year.
FMPA is conducting a member survey about 2024 training opportunities to best plan the calendar for next year.